Galante Architecture are the architects for the Cambridge Fire Headquarters renovation. As part of the project they designed four modular apparatus bays for the Cambridge Fire Department to operate out of during their major gut renovation of Headquarters. The City anticipates moving CFD back into the HQ building in January. The City of Cambridge is interested in selling the modular apparatus bays to another fire department that might need them and we thought it made sense to go through FCAM to reach as many departments as possible.
They have site plans, floor plans, drawings, and all necessary information to help another department with site test fit, sizing, etc. The units are really great, and “plug & play” for the most part. We can tour departments around the temp station if needed. The units must be relocated by April of 2027.
Please feel free to reach out to Ted Galante AIA LEED AP
Design Principal 617 576 2500
TGAS The Galante Architecture Studio Inc
www.galantearchitecture.com | Instagram | LinkedIn